Facility

Active PoPCODE BOG

Data Center in Bogotá, Colombia

Facility OwnerEquinix BG1

Network SLA
99.98%
Airport
El Dorado International Airport · 6.7 km

Facility specifications

Bogotá runs at Av. Carrera 106 No. 15A-25, Manzana 6, Lote 27, 6.7 km from El Dorado. The datasheet declares PIT de Colombia and IBX, and lists UpTime Design and Facility, ISO 9001, ISO 27001, ISO 22301, PCI-DSS 3.2.1, SOC 1 Type II, SOC 2 Type II and LEED. Forty-three on-net operators share the building, including Cogent Communications, Hurricane Electric, Telxius Cable, Ufinet Latam, ETB, TigoUne and SpaceX Starlink.

Certifications

ISO 9001 · 22301 · 27001 · SOC 1 Type II · 2 Type II · UpTime-Design and UpTime-Facility · PCI-DSS 3.2.1 · LEED

Internet Exchange (IX) points
  • PIT de Colombia
  • IBX
Available carriers

43 on-net

  • Cogent Communications
  • Hurricane Electric
  • Telecom Italia Sparkle
  • Telxius Cable
  • Liberty Networks
  • Columbus Networks Colombia
  • Ufinet Latam
  • Ufinet Ecuador
  • InterNexa
  • Flō Networks
  • IFX
  • EdgeUno
  • Gold Data
  • Gold Data USA
  • Vtal
  • Media Commerce Partners
  • ETB
  • TigoUne
  • Empresas Municipales de Cali
  • WOM Colombia
  • DirecTV Latam (VRIO)
  • Gtd Colombia
  • TV Azteca
  • S3 Wireless Colombia
  • Somos Networks Colombia
  • OSNET
  • OSNET SAS
  • Conexion Digital Express Bogota
  • Sinergy
  • Simect Group
  • Fibramax
  • FiberComm Telecomunicaciones
  • Ambafiber
  • Airtek Solutions
  • Itelkom
  • Telealfacom
  • Gonet
  • Corporación Nacional de Telecomunicaciones
  • Telconet Ecuador
  • Puntonet
  • Corporación Vnet
  • Servicios Best CTC
  • SpaceX Starlink
IPXON data center in Bogotá

Full technical datasheet

Capacity, power, cooling, and physical security: the same document our sales engineers use. Register for free to download.

How it's operated

What the network covers at every PoP, and what engineering confirms for this workload.

Who runs the network?

AS263812

Carrier neutral, BYOIP, BGP

Is there on-site support?

24/7/365

For critical incidents

Which audits apply to your workload?

Engineering confirms which audits at this facility apply to your workload and contracted plan.

Next step

Contact the sales team

Tell us what you need and where. Our team is ready to advise you.